Loading...
Checklist MS-2014-00468.tif 2009 INTERNATIONAL RESIDENTIAL CODE - QTY OF BLAI HET Return to Blair City Hll'priorto Final inspection 2'18 S '16�" Street, Blair, NE 68008 k Because of limitations caused by the infeasibility to 'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requireme following this reroofing job. Permit #. VN'�::LIQA�- installation Date: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building, (R905.2.7.1) o STRUCTURAL COMPONENTS ARE SOUND structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) EXISTING COVERIN WAS REMOVED: Existing roof covering removed for one of the reasons required by section R907.3 NO RUSTED METAL OR FLASHING; Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY. Flashing shall be reconstru cted in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Sig re of Primary Installer Date i i &gnat re of Permit Holder Date j r