1792.tif I ff
4
2009 I
RE SID E NTI A L CODE �
CITY 0
LA I R
F B
IN CHECKOFF SHEET
R eturn to Blair City Half prior to Final Inspection .
E
-
218 S i 6 th Street, Blair, NE 68008
caused b the infeasibility te'perform detailed inspections which would
Because of limitations y
• `t reroofing work, please indicate compliance with the following requirements �
not inteiere w ith �` g
following, this reroofing Job,
J 1 4 6 , 1AA----
Permit #:
Installation Date: �' f
YES NO
[� The materials and methods of application used for recovering or replacing the existing
r oof covering comply with the requirements of the building code. (R907A)
D. An ice barrier that consists of at least two layers of
� ICE pRpTECTCON Ct,�ISTAlLE as installed and
underlayment or of a self polymer modified bitumen sheet w
t least from the eayes ed to a point at least 24 inches inside the exterior
extends , a t ' � .
wall line of the building. (R9052.7.1)
COMPONENTS ARE SOUND: The structural roof components are
[� STRUCTURAL COMP and a q uip ment toads
capable of supporfiing the roof covering system and the material
• t will be encountered during installation of the roof covering system. (8907.2)
that
a
AS REMOVED: Existing roof covering was removed for one
E�1STIl�1G COVERING WAS ,
• of the reasons required by section R907.3
A L OR FLASHING: Existing vent flashing, metal edges, drain
N® RUSTED MET
outlets collars or metal counter - flashing were not reinstalled if rusted. (8907.5)
STALLED PROPERLY: Flashing shall be reconstructed in accordance
[� FLASHIIriG INSTALLED Metal flashing to which
with approved manufacturer's installation instructions.
bituminous ' materials are to be adhered shalt be primed prior to installation. (R907.6)
Signature 0 Pr ary Instal r
Dat
Signature of Permit Holder
Date