Loading...
1792.tif I ff 4 2009 I RE SID E NTI A L CODE � CITY 0 LA I R F B IN CHECKOFF SHEET R eturn to Blair City Half prior to Final Inspection . E - 218 S i 6 th Street, Blair, NE 68008 caused b the infeasibility te'perform detailed inspections which would Because of limitations y • `t reroofing work, please indicate compliance with the following requirements � not inteiere w ith �` g following, this reroofing Job, J 1 4 6 , 1AA---- Permit #: Installation Date: �' f YES NO [� The materials and methods of application used for recovering or replacing the existing r oof covering comply with the requirements of the building code. (R907A) D. An ice barrier that consists of at least two layers of � ICE pRpTECTCON Ct,�ISTAlLE as installed and underlayment or of a self polymer modified bitumen sheet w t least from the eayes ed to a point at least 24 inches inside the exterior extends , a t ' � . wall line of the building. (R9052.7.1) COMPONENTS ARE SOUND: The structural roof components are [� STRUCTURAL COMP and a q uip ment toads capable of supporfiing the roof covering system and the material • t will be encountered during installation of the roof covering system. (8907.2) that a AS REMOVED: Existing roof covering was removed for one E�1STIl�1G COVERING WAS , • of the reasons required by section R907.3 A L OR FLASHING: Existing vent flashing, metal edges, drain N® RUSTED MET outlets collars or metal counter - flashing were not reinstalled if rusted. (8907.5) STALLED PROPERLY: Flashing shall be reconstructed in accordance [� FLASHIIriG INSTALLED Metal flashing to which with approved manufacturer's installation instructions. bituminous ' materials are to be adhered shalt be primed prior to installation. (R907.6) Signature 0 Pr ary Instal r Dat Signature of Permit Holder Date