Loading...
1183.tif t INTERNA TIONAL RESIDENTI 2009 CO DE OF CI TY [ 4IR RR FING CH CKOFF SHEET Return to Blair City Hall prior to Final Inspection . 21 S 1 nth Street, Blair, NE 68008 B ecause of limitations caused by the infeasibility to'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements follo wing this reroofing job, (Y I C� Permit #: L 10H_ CA I GZ Installation Date: ` YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE pROTEC'fm INSTALLED: An ice barrier that consists of least two layers of underlayment or of a self adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (8905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of su orlin the roof covering system and the matertal and equipment loads the will be encounter d during installation of the roof covering system. (8907.2) EXISTING COVERING WAS REMOVED: Existing rootcovering was removed for one of the reasons required by section 8907.3 NO RUSTED METAL OR FLASHING: Existing vend flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY. Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) Signature Primary Inst Iler Dat Signature of Permit Holder Date