450 (3).tif t
2009 INTERNATIONAL RESIDENTIAL CODE -
L RE R OOFING CHECKO SHE
G� �A�R
Return to Blair City Hall prior to Final inspection .
218 S '16' Street, Blair, NE 68008
Because of imitations caused by the infeasibility to *perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following . this reroofing job
L A ' y
X
Permit #: ,
Installation Date:
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of - at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eaye's eda_e to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
[� STR.UGTURAL. COMPONENTS ARE SOUND. The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REIVIOVEQ: Existing roof covering was removed for one
of the reasons required by section 8907.3
[� NO RUSTED META. OR pLAS I INGY Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
Ey [3, FLASHING INSTALLED PROPERLY: dashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. fetal flashing to which
bituminous materials are to be adhered shall be prlmed prior to installation. (8907.6)
Signature o : rimmy nsta er
Qate
Signature of Permit Holder Date