Loading...
450 (3).tif t 2009 INTERNATIONAL RESIDENTIAL CODE - L RE R OOFING CHECKO SHE G� �A�R Return to Blair City Hall prior to Final inspection . 218 S '16' Street, Blair, NE 68008 Because of imitations caused by the infeasibility to *perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following . this reroofing job L A ' y X Permit #: , Installation Date: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of - at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eaye's eda_e to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) [� STR.UGTURAL. COMPONENTS ARE SOUND. The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WAS REIVIOVEQ: Existing roof covering was removed for one of the reasons required by section 8907.3 [� NO RUSTED META. OR pLAS I INGY Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) Ey [3, FLASHING INSTALLED PROPERLY: dashing shall be reconstructed in accordance with approved manufacturer's installation instructions. fetal flashing to which bituminous materials are to be adhered shall be prlmed prior to installation. (8907.6) Signature o : rimmy nsta er Qate Signature of Permit Holder Date