Loading...
1714.tif • I 2009 INTERNATIONAL RESIDEN - I CITY OF BLAIR REROO CHEC Return to Blair Clty Hall prior to Final Inspection 218 S i6 Street, Blair, NE 68008 r Because of limitations caused by the infeasibility to , perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following: this reroofing job, Permit #: 2__ Installation Date: YES NO ( The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (11907.'1) ICE PROTECTION INSTALLED: An ice barrier that consists of - at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eaye's edge to a point at least 24 inches inside the exterior wall line of the building, (R905.2.7A) STRUCTUI�AI. COMPONENT'. ARE SOUND: The structural roof components are ial and equipment loads capable of supporting the roof covering sy stem and the maters stem. (R9D7.2) • that will be encountered during installation of the roof covering Y EXISTING COVERING WAS REMOVED: Existing roof'covering was removed for one of the reasons required by section R907.3 NO RUSTED METAL OR FLASHING: EAsting vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (8907.5) d. FLASHING INSTALLED PROPERLY. Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (11907.6) w Signature of Primary In t ller Date Signature of Permit Holder Date