CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall' prior to Final inspection ,
21 8 S 1 6 Street, Blair, NE 68008
Because of limitation caused b the infeasibility to'perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
fol, towing this reroofing job.
Al 6e7r
Permit #:
F
r
Installation Date :'
YES/ NO
� The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ROTECTION INSTALLED: An ice barrier that consists of at least two layers of
� ICE P .
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's ed a to a paint at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL. COMPONENTS ARE SOUND: The structural roof components are
cov ering system and the material and equipment loads
capable of supporting the roof cov g y
that will be encountered during installation of the roof covering system. (8907.2)
EXISTI
NG COVERt1�G WAS REMOVED: Existing roof'covering was removed for one
of the reasons required by section R907.3
NO RUSTED METAL. OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5)
CX. Ft_
ASHING INS`rAtLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
. Signature af'Primary Ins alley
Dat
_ Date -
Signature of Permit Holder