Loading...
1815.tif G i I 2009 INTERNATI IDENTIAL CODE - CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall' prior to Final inspection , 21 8 S 1 6 Street, Blair, NE 68008 Because of limitation caused b the infeasibility to'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements fol, towing this reroofing job. Al 6e7r Permit #: F r Installation Date :' YES/ NO � The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ROTECTION INSTALLED: An ice barrier that consists of at least two layers of � ICE P . underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's ed a to a paint at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL. COMPONENTS ARE SOUND: The structural roof components are cov ering system and the material and equipment loads capable of supporting the roof cov g y that will be encountered during installation of the roof covering system. (8907.2) EXISTI NG COVERt1�G WAS REMOVED: Existing roof'covering was removed for one of the reasons required by section R907.3 NO RUSTED METAL. OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5) CX. Ft_ ASHING INS`rAtLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) . Signature af'Primary Ins alley Dat _ Date - Signature of Permit Holder