382.tif i
2 009 I RESIDEN C ODE {
CITY OF BLAIR REROOFING C r
Return to B r y
lai City Half p rior to Final Inspection
� i 6 t
2'18 B Street, Blair, NE 68008
Because of limitations caused by the infeasibility to *perform detailed inspections which would
interfere with g
not i `th reroofin work, please indicate compliance with the following requirements
following this reroofing job.
Permit #:
t t
Installation Date: G°
f
YES NO
� The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
10E PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eaye's edge to a point at least 24 inches inside the exterio
wall line of the building. (R905.2.7.1)
STRUCTURAL GOiVIPONENTS ARE SOUND: The structural roof components are
system and the material and equipment loads
capable of supporting the roof cover ri g y
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERIC�IG WAS REMOVED: Existing roof covering was removed for one
• � 'o
of the reasons required by section R907.3
NO RUSTED METAL OR PLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.6)
PLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
m
Signature Primary Install e Date
Date
Signature of Permit Holder