Loading...
382.tif i 2 009 I RESIDEN C ODE { CITY OF BLAIR REROOFING C r Return to B r y lai City Half p rior to Final Inspection � i 6 t 2'18 B Street, Blair, NE 68008 Because of limitations caused by the infeasibility to *perform detailed inspections which would interfere with g not i `th reroofin work, please indicate compliance with the following requirements following this reroofing job. Permit #: t t Installation Date: G° f YES NO � The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) 10E PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eaye's edge to a point at least 24 inches inside the exterio wall line of the building. (R905.2.7.1) STRUCTURAL GOiVIPONENTS ARE SOUND: The structural roof components are system and the material and equipment loads capable of supporting the roof cover ri g y that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERIC�IG WAS REMOVED: Existing roof covering was removed for one • � 'o of the reasons required by section R907.3 NO RUSTED METAL OR PLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.6) PLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) m Signature Primary Install e Date Date Signature of Permit Holder