Loading...
381.tif i 2009 INTERNATIONAL RES IDENTI A L CITY OF B RER OOFING CHECKOFF SHEET Return to Blair City Half prior to Final inspection 21 8 B th 16 street. Blair, NE 68008 Because of limi tations caused by the infeasibility to 'perform detailed inspections which would not interfere with reroofing worm, please indicate compliance with the following requirements f, ollowin this reroofing job. NZ Permit #: 1 Installation Dater YES/ NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers 'of f adhering polymer modified bitumen sheet was installed and underlayment or of a sel extends at (east at least 24 inches inside the exterior from the eave's edge to a point wail line of the building. (R905.2.7.1) STRUCTURAL C OMPONENTS A RE SOUND: The rting the roof cov ering structural roof components are capable of suppo ` system and the material and equipment load g y that will be encountered during installation of the roof covering system. (8907.2) (� BXISTII�IO COVERII�O 1N'AS REMOVED: Existing roof'covering was removed for one of the reasons required by section R907.3 N o USTED METAL ®R FLASHING - : Existing vent flashing, metal edges, drain [� R outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5) . SLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) D to Signat r o 'd ary I st Her Signature of Permit Holder Date