381.tif i
2009 INTERNATIONAL RES IDENTI A L
CITY OF B RER OOFING CHECKOFF SHEET
Return to Blair City Half prior to Final inspection
21 8 B th 16 street. Blair, NE 68008
Because of limi tations caused by the infeasibility to 'perform detailed inspections which would
not interfere with reroofing worm, please indicate compliance with the following requirements
f, ollowin this reroofing job.
NZ
Permit #:
1
Installation Dater
YES/ NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers 'of
f adhering polymer modified bitumen sheet was installed and
underlayment or of a sel
extends at (east at least 24 inches inside the exterior
from the eave's edge to a point
wail line of the building. (R905.2.7.1)
STRUCTURAL C OMPONENTS A RE SOUND: The rting the roof cov ering structural roof components are
capable of suppo
` system and the material and equipment load
g y
that will be encountered during installation of the roof covering system. (8907.2)
(� BXISTII�IO COVERII�O 1N'AS REMOVED: Existing roof'covering was removed for one
of the reasons required by section R907.3
N o USTED METAL ®R FLASHING - : Existing vent flashing, metal edges, drain
[� R
outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5)
. SLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
D to
Signat r o 'd ary I st Her
Signature of Permit Holder Date