Checklist MS-2014-01609.tif 2009 INTERNATIONAL RESIDENTIAL CODE -
C ITY OF BL
Return to Blair City Hall ' prior rior to Final Inspection
2'I S S '16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to'perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirem
following this reroofing job.
Permit #� , I
Installation Date.
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
ICI~ PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eaye's ed a to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering y
erin system and the material and equipment loads
.
.. that will be encountered during installation of the roof covering system. (R907.2)
EXISTING CO1lERlNG VAS REMOVE -D: Existing roof covering was removed for one
of the reasons required by section R907.3
(� NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED pR.OP1 =RLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Fetal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
1
Signature of Primary Installer D
E
Sign re f Permit H der ate