Loading...
Checklist MS-2014-01609.tif 2009 INTERNATIONAL RESIDENTIAL CODE - C ITY OF BL Return to Blair City Hall ' prior rior to Final Inspection 2'I S S '16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirem following this reroofing job. Permit #� , I Installation Date. YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ICI~ PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eaye's ed a to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering y erin system and the material and equipment loads . .. that will be encountered during installation of the roof covering system. (R907.2) EXISTING CO1lERlNG VAS REMOVE -D: Existing roof covering was removed for one of the reasons required by section R907.3 (� NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED pR.OP1 =RLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Fetal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) 1 Signature of Primary Installer D E Sign re f Permit H der ate