Checklist MS-2014-00363.tif G
t
t
I
f
2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
R eturn to fir City Hall i i l Inspecti
th
1 1 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following r
following this reroofing job.
Permit #: , �'�� ' ON 3
Installation Date:
i
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
`�; ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underiayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
® STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
I
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS MOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
DU NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY:, Flashing shall be reconstructed in accordance f
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
i
- ice -�y i
SlgKarure of Primary Installer Date
i
i
Sigrgure of PerCit Holder Date i
i
I
i