Loading...
Checklist MS-2014-00363.tif G t t I f 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET R eturn to fir City Hall i i l Inspecti th 1 1 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following r following this reroofing job. Permit #: , �'�� ' ON 3 Installation Date: i YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) `�; ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underiayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ® STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are I capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WAS MOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 DU NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY:, Flashing shall be reconstructed in accordance f with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) i - ice -�y i SlgKarure of Primary Installer Date i i Sigrgure of PerCit Holder Date i i I i