Checklist MS-2014-00297.tif i
t
z009 INTERNATIONAL RESIDENTIAL CODE
REROOFI
CITY OF BLAIR R eturn to B lair C ity Hall prior t F inal I n sp ection
218S to S tre e t, Blair, NE 68008
Because of limitations caused b the infeasib to p erform detailed Inspections w hich would
not Interfere with reroofing work, please' Indicate compliance with the following requirements
following this reroofing job.
Property Address: ! � i✓J
p, _Y Contractor or Homeowner (if self)
Permit - 014- 00 e29
Installatio Date.
YE NCB
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PRO 'E TION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of e se lf- adh ering po modified bitumen sheet was insta lled and
extends at least from the eave' edge to a_point at least 24 inches inside the exter
/ / wall line of the building. (R905.2,7,1
01 STRUCTURAL COMPONENTS AR E SOUND. The structural roof components are r
capable of supporting the roof covering. system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8997.2)
EXISTING COVERING WAS REMOVED. Existing roof covering was removed for one
of the reasons required by section 8907.3
DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, cellars or metal counter - flashing were not reinstalled if rusted. (R907.5)
FLASHING IN PROPERLY: Flashing shall be reconstructed in accordance
with approved `manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6)
Signa re of ista b ate
Sign" ure of Permit Holder Dat