Loading...
Checklist MS-2014-00297.tif i t z009 INTERNATIONAL RESIDENTIAL CODE REROOFI CITY OF BLAIR R eturn to B lair C ity Hall prior t F inal I n sp ection 218S to S tre e t, Blair, NE 68008 Because of limitations caused b the infeasib to p erform detailed Inspections w hich would not Interfere with reroofing work, please' Indicate compliance with the following requirements following this reroofing job. Property Address: ! � i✓J p, _Y Contractor or Homeowner (if self) Permit - 014- 00 e29 Installatio Date. YE NCB The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PRO 'E TION INSTALLED An ice barrier that consists of at least two layers of underlayment or of e se lf- adh ering po modified bitumen sheet was insta lled and extends at least from the eave' edge to a_point at least 24 inches inside the exter / / wall line of the building. (R905.2,7,1 01 STRUCTURAL COMPONENTS AR E SOUND. The structural roof components are r capable of supporting the roof covering. system and the material and equipment loads that will be encountered during installation of the roof covering system. (8997.2) EXISTING COVERING WAS REMOVED. Existing roof covering was removed for one of the reasons required by section 8907.3 DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, cellars or metal counter - flashing were not reinstalled if rusted. (R907.5) FLASHING IN PROPERLY: Flashing shall be reconstructed in accordance with approved `manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) Signa re of ista b ate Sign" ure of Permit Holder Dat