407_0001.tif i
I
.i
O INTERNAT
o F HEFT
CITY OF LAIR RERO FIND CHECKOF
Return to Blair City Hall prior to Final Inspection
218 S '16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not �nterf ere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit #:
Installation Date:
I
i
i
i
YE NO
The materials and methods of application used for recovering or replacing the existing j
roof covering bomply with the requirements of the building code. (R907.1)
i
®
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eavds edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
C� STRUCTURAL
COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
i
® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
e RUSTED METAL OR FLASHING: Existing vent flash! ; metal edges, drain
NO
- ashin were not reinstalled if rusted. (R907.5)
,.outlets, collars or metal counter fl g
i
i
FLASHING, INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which'.
bitu ous ►p rials are to be adhered shall be primed prior to installation. 907.6)
�.
Z
Signature of Primary Installer
Date
t
Date
Signature of Permit Holder
i
i