Loading...
407_0001.tif i I .i O INTERNAT o F HEFT CITY OF LAIR RERO FIND CHECKOF Return to Blair City Hall prior to Final Inspection 218 S '16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not �nterf ere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit #: Installation Date: I i i i YE NO The materials and methods of application used for recovering or replacing the existing j roof covering bomply with the requirements of the building code. (R907.1) i ® ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eavds edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) C� STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) i ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 e RUSTED METAL OR FLASHING: Existing vent flash! ; metal edges, drain NO - ashin were not reinstalled if rusted. (R907.5) ,.outlets, collars or metal counter fl g i i FLASHING, INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which'. bitu ous ►p rials are to be adhered shall be primed prior to installation. 907.6) �. Z Signature of Primary Installer Date t Date Signature of Permit Holder i i