Loading...
121_0001.tif CODE P RfATIC�NAL RESIDENTIAL 2009 J CITTOF BLAIR REROOFING CHECKOFF SHEET kibturn to : Blair City Hall prior to Final inspection 218 S i 6 Street, Blair, NE 68 Because of limitations caused by the infeasibility to *perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements followin his reroofih0lob.' Kermit #: ` L4 6 iristaliatien Date: 1 YES NO k The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underiayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are e and the material and equipment loads capable covering the r g Y able of suppor p , that will be encountered during Installation of the roof covering system. (R907.2) i EXISTING COVERING WAS REMOVED: Existing reof'covering was removed for one of the reasons required by section R907.3 n il/ E ® NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) [ ❑, FLASHING IN5TALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bitumi ous materials are to be adhered shall be primed prior to installation. (R907.6) �7 ®a 1 Signature of Primary Installer Date I Signature of Permit Holder Date