121_0001.tif CODE
P RfATIC�NAL RESIDENTIAL
2009 J
CITTOF BLAIR REROOFING CHECKOFF SHEET
kibturn to : Blair City Hall prior to Final inspection
218 S i 6 Street, Blair, NE 68
Because of limitations caused by the infeasibility to *perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
followin his reroofih0lob.'
Kermit #: `
L4 6
iristaliatien Date:
1
YES NO
k The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underiayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
e and
the material and equipment loads
capable covering
the r g Y
able of suppor
p ,
that will be encountered during Installation of the roof covering system. (R907.2)
i
EXISTING COVERING WAS REMOVED: Existing reof'covering was removed for one
of the reasons required by section R907.3
n il/ E
® NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
[ ❑, FLASHING IN5TALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bitumi ous materials are to be adhered shall be primed prior to installation. (R907.6)
�7 ®a 1
Signature of Primary Installer Date
I
Signature of Permit Holder Date