Loading...
Checklist MS-2014-02023.tif i I f a r 2009 INTERNATIONAL RESIDENTIAL CODE C ITY OF BLAI R'REROOFING R eturn to Bl City Hall prior to Final inspection 218 S 18 Street, Blair, NE 68008 s Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, prase indicate compliance with the following requirements follbwin this reroofing job, e f7> Permit #: i y � i f Installation Date: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply With the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayrnent or of a self- polymer modified bitumen sheet gas installed and ds at least from the eave's ed st 24 inches l the exterior exte a to a point at lea wall line of the building, (R905.2.7 ) STRUDTURAL CC31VlPt3NENTS ARE SOUND; The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. {R907,} f , r COVERING WAS REMOVED: Existing roof covering was removed for one EXIST]i�lG GO I of the reasons required by section R - 907,3 i . drain No RUSTED METAL OR FLASHINg. Existing vent flashing, metal edges .., outlets, collars or metal counter-flashing were not reinstalled if rusted, (R907.5) 3 r t FLASHING INSTALLED PROPERLY Flashing shall be reconstructed in accordance w1th approved manufacturer's Installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) ` L Sigma 'e of Prim nr staller Date 3 J S�gna re of Par Molder Date { 4 { f. t E - 2009 4 CITY OF BLAIR REROOFING CHECKO SHEET ' Return to Blair City/ Hall prior to Final Inspection 21 8 S 16 Street, Blair, NE 68808 Because of limitations caused by the infeasibility to'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following. this reroofing job. Permit D 2 �J P ( C) \LA Installation Date: YES, NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wail line of the building. (8905.2.7.1) [� STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) (� EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter were not reinstalled if rusted. (8907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bzrylnstaller terials are to be adhered shall be primed prior to installation. (8907.6) dl� ig Date ej J PV U1 I o er Date