Checklist MS-2014-02000.tif I
IAL CODE -
2009 INTERNATIONAL RESIDENT
4
CITY OF BLAIR REROOFING C HECKOF F
Return to Blair City Hall•prior to Final inspection
21 S Itth Street, Blair, NE-68008
Because of limitations caused by the infeasibility to *perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
0 owin this reroofing 'ob.
f Il gJ �
Permit #:
Installation Date:
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
I C E PRO INSTALLED: An ice barrier that consists of at least two layers of
�
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eaye's edge to a point at least 24 inches inside the exteri
wall line of the building, (R905.2.7.1)
STRUCTURAL COMPONENTS ARI SOUND: The structural roof components are
T s
capable of supporting the roof covering stem and the material and equipment loads y
that will be encountered during installation of the roof covering system. (8907.2)
E�ISTIN
O COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation Instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6)
Signatur f Primary installer
Date
a�
Signal of Permit Holder
f