Loading...
Checklist MS-2014-02000.tif I IAL CODE - 2009 INTERNATIONAL RESIDENT 4 CITY OF BLAIR REROOFING C HECKOF F Return to Blair City Hall•prior to Final inspection 21 S Itth Street, Blair, NE-68008 Because of limitations caused by the infeasibility to *perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements 0 owin this reroofing 'ob. f Il gJ � Permit #: Installation Date: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) I C E PRO INSTALLED: An ice barrier that consists of at least two layers of � underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eaye's edge to a point at least 24 inches inside the exteri wall line of the building, (R905.2.7.1) STRUCTURAL COMPONENTS ARI SOUND: The structural roof components are T s capable of supporting the roof covering stem and the material and equipment loads y that will be encountered during installation of the roof covering system. (8907.2) E�ISTIN O COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation Instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) Signatur f Primary installer Date a� Signal of Permit Holder f