Checklist MS-2014-01663.tif j_
j
s
i
I
I
0"'009 INTERNATIONAL RESIDENTIAL LC& 0 D' E
i
I BLAIR ' REROOFING CHECKOFF SHEET
Return to
Blair City Hall prior to Final Inspection
e� � 0
�1 8 i Street, Bl air, would
se of limitations cawed by the infeasibility t� pe rform detailed inspections which
Because
i
not interfere with reroofing work, pease Intricate compliance with the following r e qui r ements
follgALInA this reroofing job,,
Per m it #: a -
i
! i
7 �
S
Installation Date;
YES NO
The Materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code, (8907, I)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
g polymer modified bitumen sheet was installed and
�tddarlayment or of a self- adherin
ed a to a point
extends at least from the eave's at least 2� inches inside the exterior
wall line of the building. {R906,2.7.1}
STRUCTURAL CC�IVIPONENTS ARE SOUND: The structural roof components are
ca able of supporting the roof covering system and the material and equipment loads f
p
that will be encountered during installation of the roof covering system. (R9O7.2)
EXI-qTIWC
COVERING REMOVED: Existing roof covering was removed for one
of the reasons require WAS d by section 8907.3 e
NO RUSTED METAL OR FLASHING: Existing vent flashing metal edges, drain
[3 -
i
outlets, collars or Metal counter flashing were not reinstalled if rusted, (R807,5) I
L�1SHll�IG 1NS`rALLED PROPERLY: Flashing shall be reconstructed in accordance ;
E Metal flashing to which
NWdh approved rnar�ufac #urer's installation instructions,
adhered shall be primed prior to installation. (8907,6)
b ituminous materials are to be
Si of Primary l tall Date
f
E
�� Date
Signa ure of Permit Molder