Loading...
Checklist MS-2014-01663.tif j_ j s i I I 0"'009 INTERNATIONAL RESIDENTIAL LC& 0 D' E i I BLAIR ' REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection e� � 0 �1 8 i Street, Bl air, would se of limitations cawed by the infeasibility t� pe rform detailed inspections which Because i not interfere with reroofing work, pease Intricate compliance with the following r e qui r ements follgALInA this reroofing job,, Per m it #: a - i ! i 7 � S Installation Date; YES NO The Materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code, (8907, I) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of g polymer modified bitumen sheet was installed and �tddarlayment or of a self- adherin ed a to a point extends at least from the eave's at least 2� inches inside the exterior wall line of the building. {R906,2.7.1} STRUCTURAL CC�IVIPONENTS ARE SOUND: The structural roof components are ca able of supporting the roof covering system and the material and equipment loads f p that will be encountered during installation of the roof covering system. (R9O7.2) EXI-qTIWC COVERING REMOVED: Existing roof covering was removed for one of the reasons require WAS d by section 8907.3 e NO RUSTED METAL OR FLASHING: Existing vent flashing metal edges, drain [3 - i outlets, collars or Metal counter flashing were not reinstalled if rusted, (R807,5) I L�1SHll�IG 1NS`rALLED PROPERLY: Flashing shall be reconstructed in accordance ; E Metal flashing to which NWdh approved rnar�ufac #urer's installation instructions, adhered shall be primed prior to installation. (8907,6) b ituminous materials are to be Si of Primary l tall Date f E �� Date Signa ure of Permit Molder