Loading...
Checklist MS-2014-01546.tif k f 2009 INTERNATIONAL RESIDENTIAL CODE H SH T �TY �A� RERO OFIN G Return to Blair City all prior to Final Inspection th � F 2'18 S'16 Street, Blair, NB 68008 Because of limitations caused by the • • I erform detailed inspections which would i y P of interfere with reroofing work, please indicate compliance with the following requirements j I followina this reroofing job. hermit #� o 2a) f Installation Date. - 30 - / YES NO The materials and methods of application usbd for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eavds edge to a point at least 24 inches inside the exterior wall, line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND- The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the covering system. (8907.2) (� EXISTING CO VERING WAS REMOVED; Existing roof covering was removed for one of the reasons required by section R907.3 (� NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (8907.5) LASHING INSTALLED PROPERLY; Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation, (8907.6) of Primary Installer Date ' Date Signature of Permit H der