Loading...
Checklist MS-2014-01545.tif e j I 2009 I INTERNATONAL CI O B LAIR R R eturn to Blair ir cif Hall'priorto Final Inspection 218 S 16 to street, Blair, NB 68008 Because of limitations caused by the infeasibility to'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements followinEl this reroofing job. Permit: Installation Date: YES NO The materials and methods of application usbd for recovering or replacing the existing ' s of the building I roof covering comply with the requirement g code. (R907.1) IcE pROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was Installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wail, line of the building. (8905.23.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are L capable of supporting the roof covering system and the material and equipment loads ..; that will be encountered during installation of the . roof covering system. (R907.2) EXISTING COVERING WAS REMgVED: Existing roof covering was removed for one of the reasons required by section R907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5) PLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) q 0 1mary installer Date 7 ' `� Date I Signature of Permit Holde f ( I j