Checklist MS-2014-01545.tif e j
I
2009
I INTERNATONAL
CI O B LAIR R
R eturn to Blair ir cif Hall'priorto Final Inspection
218 S 16 to street, Blair, NB 68008
Because of limitations caused by the infeasibility to'perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
followinEl this reroofing job.
Permit:
Installation Date:
YES NO
The materials and methods of application usbd for recovering or replacing the existing
' s of the building I
roof covering comply with the requirement g code. (R907.1)
IcE pROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was Installed
and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wail, line of the building. (8905.23.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
L capable of supporting the roof covering system and the material and equipment loads
..; that will be encountered during installation of the . roof covering system. (R907.2)
EXISTING COVERING WAS REMgVED: Existing roof covering was removed for one
of the reasons required by section R907.3
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5)
PLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6)
q 0 1mary installer Date
7 '
`� Date I
Signature of Permit Holde
f
(
I
j