Loading...
Checklist MS-2014-01350.tif i ham 2009 INTERNATIONAL RESIDENTIAL COI)h CITY OF BLAIRREROOFING CHECKOFF SHEET Re turn to B lair City Hall prior to Filial inspection 218 S 16 St reet, B lair y NE 68088 would Because of limitations caused by the infeasibility to perform detailed inspections which end at interfere with reroofing work, please indicate compliance with the following requ�rem followin this reroofing lob. 1 3's .. I Permllt #: = t Installation Date.; t NO i The materials and methods of application used for recovering or replacing the exis ting roof covering comply With the requirements of the building code. (8967.1) ICE PRO TECTION 'loN II STAi -I-�D; An ice barrier that consists of at least two layers of underlaymenf or of a self -adhering p olymer mer modified bitumen sheet was 1nst alied and extends a# least from the eaye's 9 e to a paint at least 2 inches inside the exterior well line of the building. (11946.2.7.1) STRUCTURAL COMPONENTS ARE SOUND. The structural roof components are ment capable of supporting the roof covering system and the material and equleads that will be encountered during installation of the roof covering system. (R907.2) i E 1i Till GC 1�ERlAIG WAS RElVlOVED. Existing roof covering was removed for one of the reasons required by section 8947.3 i i i H� RUSTED M ET�1L OR FLASHING: Existing vent flashing, metal edges, drain outlets, cellars or metal counter- flashing were not reinstalled if rusted. {R947.6} ! I i i FLASHING INSTALLED PROPER! -'Y: Flashing shall be reconstructed in accordance F Metal flashing to which with approved 'Manufacturer's ins tallation instructions. bituminous materials are to be adhered shall be primed prior to installation. (8907.6) - Date Signature of Primary insfAdr Date Signa#ure of hermit Holder � c