Checklist MS-2014-01349.tif 1
I
, I
k
2009 INTERNATIONAL RESIDENTIAL CODE
t
CITY OF BLAIRREROOFING CHECKOFF SHEET
R eturn to Blair City Ha ll prier to Final Inspect
218 S i 6 street, Blair, NE 88008
1
Because of limitations caused by the Infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
follwin this reroofing job,
i✓p 4
. b �
Permit #:
I
Installation Date.
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8947,1)
MEMO INSTALL.E , An ice barrier that consists of at least two layers of
underlayrnent or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eaye's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SC}UND; The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
., that will be encountered during installation of the roof covering system. (R9972)
i
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
t
No RUSTED METAL OR FLASHING; Existing vent flashing, metal edges, ;n �
outlets, collars or metal counter flashing were not reinstalled if rusted. (R o � 5 ) �
i
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
Metal flashing to which
vvith approved' manufacturer's installation instructions. • stallatlan, 8907.6
bituminous materials are to be adhered shall be pruned prior to to { )
r
Signature of Primary Installer Date
i
Date
Signa ure of Permit Holder