Loading...
Checklist MS-2014-01349.tif 1 I , I k 2009 INTERNATIONAL RESIDENTIAL CODE t CITY OF BLAIRREROOFING CHECKOFF SHEET R eturn to Blair City Ha ll prier to Final Inspect 218 S i 6 street, Blair, NE 88008 1 Because of limitations caused by the Infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements follwin this reroofing job, i✓p 4 . b � Permit #: I Installation Date. YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8947,1) MEMO INSTALL.E , An ice barrier that consists of at least two layers of underlayrnent or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eaye's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SC}UND; The structural roof components are capable of supporting the roof covering system and the material and equipment loads ., that will be encountered during installation of the roof covering system. (R9972) i EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 t No RUSTED METAL OR FLASHING; Existing vent flashing, metal edges, ;n � outlets, collars or metal counter flashing were not reinstalled if rusted. (R o � 5 ) � i FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance Metal flashing to which vvith approved' manufacturer's installation instructions. • stallatlan, 8907.6 bituminous materials are to be adhered shall be pruned prior to to { ) r Signature of Primary Installer Date i Date Signa ure of Permit Holder