Loading...
Checklist MS-2014-01328.tif AL 2009 RESIDENT COD I NTERNATION CITY OF CHECKO S HEET BLA Return to Blair Cit y Hall' prior to Final Inspection 218 S 18 to Street, Blair, NE 880 08 Because of ttmtfiatt Y limitations caused b the infeasibility to'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. dLo\q - D Permit #: Installation Date. C2A r ,- ,o LA YES, NO Th e materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) Q ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eaye's ed e to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof co g y co vering system and the material and equipment loads . that will be encountered during installation of the roof covering system. (8907.2) ING COVERING WAS REMOVED: Exist E�CI S ing roof covering was removed for one T of the reasons required by section R907.3 NO RUSTED t1I1ETAL OR FLASHING x Existi ng vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bitu us materials are to be adhered shall be primed prior to installation. (8907.6) ig rim ry Installer Date i St 't 0- er Date t