Loading...
Checklist MS-2014-01029.tif i i f 1 E w"NTI L CODE 2009 INTERNATIONAL OR Ut A CITY OF BLAIR'REROOFING CHECKOFF SHEE Returns to Blair C it y Hall prior to Final inspection 218 S 18 Street, Bla NE 68048 caused by the Infeasibility to perform detailed Inspections which would Because of limitations of interfere with reroofing work, please indicate compliance with the following requirements � =followin this reroofing jab. a-A Permit #: ; Installation Date.. i YES NO The materials and methods of application used for recovering or replacing the existing )al roof covering comply with the requirements of the building code. (R9671) ICE pRQTECTt phi INSTALLED. An ice barrier that consists of at least two layers of ui�derla anent or of a self - adhering polymer modified bitumen sheet was installed and y t least from a aye's ad e to a paint at least 24 inches inside the exterior extends a a e _ gall line of the building. (R905. 2.71) ' STRUCTURAL CQMpONENTS ARF, SOUN C: The structural goof components are of supporting the roof covering system and the material and equipment loads capable pp g that will be encountered during installation of the roof covering system. (R9972) a • i EXISTtI1l� C p1lERttrlG WAS REMOVED: Existing roof covering was removed for one I of the reasons required by section R907.3 I UST D N11 =TAL OR FLASHING v. Existing vent flashing, metal edges, drain ND R outiets, collars or metal counter-flashing were not reinstalled if rusted. {R907.6} i LASHING lItiSTALlrED PRC}PERLY; Flashing shall be reconstructed in accordance F Metal flashing to which with approved rnanufacturer's Installation instructions bituminous m ateria l u are to be adhered shall be primed prior to installation. (8947.6) Sign re of Primary nst ler Date t a� Bate Signature of Permit Holder {