Loading...
Checklist MS-2014-01027.tif AftKODE - 2009 INTERNATIONAL RESIDEN V AL CITY OF BLAIR'REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection M S Wj' street, Blair, NE 68008 IntbasibilitY t perform detailed i which would B of limitations caused by the n ot interfere with reroofing work pleas a indicate c ompliance with the following requirements following, this reroofing job. Permit ev� Installation Date: ------- YES No The Mate'rialS and methods of application used for recovering or replacing the e roof covering comply With the requirements of the building code, (8907.1) ICE PROTECTION INSTALLED: An ice barrier that con sists of at least two layers of un derlayment or of a self-adhering p modified bitumen s heet wa s installed_ and extends at least from the eave!s ed-g—e to a point the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE soU_ND: The structural roof components are capable Of Supporting the roof covering s ystem and the material and eq uipment loads R907.2 that will be e ncountered during Installation of the r oof covering s y stem. ( ) G WAS REMOVED: Existing roo cover was removed for one of the reasons required by section R907.3 4 NO RU STED META L OR FLASHIN—G.' Existing vent flashing, metal edges, drain _ — out lets, collars or metal counter-flashing were not reinstalled if rusted, (R907.5) FLASHING INSTAL ED PROPERLY—: Flashing shall be reconstructed in accordance instructions. Metal flashing to which With — a pproved'manufacturer's Installation bituminous materials are to be adhered shall be primed prior to Installation. (R907-6) Slgna re of Prim nstaller Date Date Signature o f Permit Holder