Checklist MS-2014-01027.tif AftKODE -
2009 INTERNATIONAL RESIDEN V AL
CITY OF BLAIR'REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
M S Wj' street, Blair, NE 68008
IntbasibilitY t perform detailed i which would
B of limitations caused by the
n ot interfere with reroofing work pleas a indicate c ompliance with the following requirements
following, this reroofing job.
Permit
ev�
Installation Date: -------
YES No
The Mate'rialS and methods of application used for recovering or replacing the e
roof covering comply With the requirements of the building code, (8907.1)
ICE
PROTECTION INSTALLED: An ice barrier that con sists of at least two layers of
un derlayment or of a self-adhering p modified bitumen s heet wa s installed_ and
extends at least from the eave!s ed-g—e to a point the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE soU_ND: The structural roof components are
capable Of Supporting the roof covering s ystem and the material and eq uipment loads
R907.2
that will be e ncountered during Installation of the r oof covering s y stem. ( )
G WAS REMOVED: Existing roo cover was removed for one
of the reasons required by section R907.3
4
NO RU STED META L OR FLASHIN—G.'
Existing vent flashing, metal edges, drain
_ —
out lets, collars or metal counter-flashing were not reinstalled if rusted, (R907.5)
FLASHING INSTAL ED PROPERLY—: Flashing shall be reconstructed in accordance
instructions. Metal flashing to which
With — a pproved'manufacturer's Installation
bituminous materials are to be adhered shall be primed prior to Installation. (R907-6)
Slgna re of Prim nstaller Date
Date
Signature o f Permit Holder