Loading...
Checklist MS-2014-00812.tif 1 r i 2009 INTERNATIONAL RESIDENTIAL CODE - C C I T Y OF BLAI Return to Blair C it Hall'priorto Final inspection 2'18 S '16 th St r eet, Bla NB 68 008 Because of limitations itations caused by the infeasibility to'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit #: ( � Installation Date: YES NO t The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) [� ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of modified bitumen sheet was installed and underlayment or of aself- adhering polymer extends at least from the eave's edge to a point at least 244 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND The structural roof components are capable of supporting the roof co vering system and the material and equipment loads . o g y that will be encountered during installation of the . roof covering system. (R907.2) „ SING IN COVERG WAS REMOVED: Existing roof covering was removed for one � EXIT . of the reasons required by section R907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5) PLASHING INSTALLED PROPERLY: dashing shall be reconstructed in accordance with approved manufacturer's installation instructions. fetal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) r Installer Date Si nature of Permit Ho er Date g