Loading...
Checklist MS-2014-00797.tif 2009 INTERNATIONAL RESIDENTIAL CODE ROOFING CHECKOFF SHEET CITY OF BLAIR RE Return to slair City Hall prier to Final Inspection 218 S 16 Street Blair, NE 68006 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this roroofing job. Permit #: Installation Dad. i ES NG ' The materials and methods of application used for recovering or replacing the exlsfing roof cohering comply with the requirements of the building code. (R907.i) ICE PRO ECTIGN I An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eaye's edqe_ to a point at least 24 inches inside the exterior wall line of the building. (8905.2.7.1) STRUCTURAL C{ MPONENTi S ARE SOU Na: The structural roof components are capable of supporting the root covering system and the material and equipment loads that will be encountered during Installation of the roof covering system. (8907.2) EXISTING C ERING WAS REMOVED: Existing roof covering was removed for one I of the reasons required by section 8907.3 ; NO RUSTED FETAL OR FI&SHING: Existing vent flashing, metal edges, drain j outlets, collars or metal counter - flashing were not reinstalled if rusted, (P997.5) I I FLASHING INSTALLED PRGPI RL.Y: Flashing shall be reconstructed in accordance with approved manufacturer's Installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.0) Signatwe of Primary Installer Date I s pate Signal of Permit Molder 4 f