Checklist MS-2014-00797.tif 2009 INTERNATIONAL RESIDENTIAL CODE
ROOFING CHECKOFF SHEET
CITY OF BLAIR RE
Return to slair City Hall prier to Final Inspection
218 S 16 Street Blair, NE 68006
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this roroofing job.
Permit #:
Installation Dad.
i
ES NG
' The materials and methods of application used for recovering or replacing the exlsfing
roof cohering comply with the requirements of the building code. (R907.i)
ICE PRO ECTIGN I An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eaye's edqe_ to a point at least 24 inches inside the exterior
wall line of the building. (8905.2.7.1)
STRUCTURAL C{ MPONENTi S ARE SOU Na: The structural roof components are
capable of supporting the root covering system and the material and equipment loads
that will be encountered during Installation of the roof covering system. (8907.2)
EXISTING C ERING WAS REMOVED: Existing roof covering was removed for one I
of the reasons required by section 8907.3 ;
NO RUSTED FETAL OR FI&SHING: Existing vent flashing, metal edges, drain j
outlets, collars or metal counter - flashing were not reinstalled if rusted, (P997.5) I
I
FLASHING INSTALLED PRGPI RL.Y: Flashing shall be reconstructed in accordance
with approved manufacturer's Installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.0)
Signatwe of Primary Installer Date
I
s
pate
Signal of Permit Molder
4
f