Loading...
Checklist MS-2014-00687.tif 2009 INTERNATIONAL RESIDENTIAL CODE FING CHECKOFF SHEET CITY OF BLAIRREROO eturn lair ity Hall prior to Final Inspection R to B C 218 s i6t" street, Blair, NE 68008 s of limitations caused by the infeasibility to Pe rform detailed i whirh would no A.- t interfere wl . th reroofing work3 please indicate c ompliance with th following requirements following this reroofing job. V Permit 4: N tt� -� � t ' Installation Date: YES NO The materials and methods of a pp lication used for recovering or replacing the existing roof covering comply with the requirements of the building code, (R907A) consists of at least two layers of NSTALLED: An ice barrier that underlayment or of a self-adhering polymer modified bitumen sheet was installed and to a point at [east 24 Inch the exterior extendsat least from the eavg?.q es lm�lde wall line of the building (R905,2.7 STRUCTURAL COMPONENTS ARE SOUND- The structu ral r oof components are capable of supporting the covering system and the material and e quipment loads that will be encountere d during installation of the ro of covering system. (R9072) 4G WAS REMOVED: Existing r oof covering was removed for one 4.- of the reasons required by section R907.3 SHING1. EXI I metal edges, drain OR FLA sting vent flashing, ou tlets, collars or metal counter-flashing were not reinstalled if rusted, (8907.5) FLASHING INSTALLED PROPERLY. Flashing shall be reconstructed in accordance with ap roved m anufacturer's I stallation instructions, metal flashing to which p bituminous materials a re to be adhered shall be petmed prior to installatio n, (R907,6) Q11 14 Signature of Primary Insta r r Date Date S IC �n'a ure of Permit Holder