Checklist MS-2014-00687.tif 2009 INTERNATIONAL RESIDENTIAL CODE
FING CHECKOFF SHEET
CITY OF BLAIRREROO
eturn lair
ity Hall prior to Final Inspection
R to B C
218 s i6t" street, Blair, NE 68008
s of limitations caused by the infeasibility to Pe rform detailed i whirh would
no A.-
t interfere wl . th reroofing work3 please indicate c ompliance with th following requirements
following this reroofing job.
V
Permit 4:
N tt� -� � t '
Installation Date:
YES NO
The materials and methods of a pp lication used for recovering or replacing the existing
roof covering comply with the requirements of the building code, (R907A)
consists of at least two layers of
NSTALLED: An ice barrier that
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
to a point at [east 24 Inch the exterior
extendsat least from the eavg?.q es lm�lde
wall line of the building (R905,2.7
STRUCTURAL COMPONENTS ARE SOUND- The structu ral r oof components are
capable of supporting the covering system and the material and e quipment loads
that will be encountere d during installation of the ro of covering system. (R9072)
4G WAS REMOVED: Existing r oof covering was removed for one
4.-
of the reasons required by section R907.3
SHING1. EXI I metal edges, drain
OR FLA sting vent flashing,
ou tlets, collars or metal counter-flashing were not reinstalled if rusted, (8907.5)
FLASHING INSTALLED PROPERLY. Flashing shall be reconstructed in accordance
with ap roved m anufacturer's I stallation instructions, metal flashing to which
p
bituminous materials a re to be adhered shall be petmed prior to installatio
n, (R907,6)
Q11 14
Signature of Primary Insta r
r Date
Date
S IC �n'a ure of Permit Holder