Loading...
Checklist MS-2014-00686.tif 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIRREROOFING CHECKOFF SHEET Return to Btair City Hall prior to Final inspection 21-8 S 16th street, Blair, NE 68008 Be of limitations caused by the infeasibility to perform detailed i ns pections which would I I I not interfere with reroofing work, please indicate compliance with the following r equirements i following this re ropfing job. V 1, 0 t Permit M, Installation Date: YES, NO The materials and methods o f a pplication used for r ecovering or replacing the existing roof covering comply with the requirements of the building code, (R907A) er that consists of at least two layers Of ICE PROTECTION . INSTALLED: An ice barrier dified bitumen sheet was installed aria un derlayment or of a self-adhering polymer MO extends at least from the eayg! s ed & to a point at least 24 inches inside the exterior wa ll fl n e of the building. (R906.2.7.1) STRUCTURAL COMARE 1-- ONVMTS AR ' The structural roof components are capable of supporting the roof covering system and the material and equipment loads that Will be encountered during Installation of the roof covering system. (8907.2) s ti ng r oof covering was removed for one G WAS REMOVED: Ext EXISTING COVERIN - , — - i of the reasons required by section 8907.3 No RUSTED METAL OR, FLASHING ,: Existing vent flashing, metal edges, drain outlets, collars or metal counter-fla shing were not reinstalled if rusted, (8907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstrticted in accordance with approved ' installation instructions. Metal ilashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907,6) Date ; Primary I lien Signatur of Primary I lier Date Signature of Permit Holder