Checklist MS-2014-00686.tif 2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIRREROOFING CHECKOFF SHEET
Return to Btair City Hall prior to Final inspection
21-8 S 16th street, Blair, NE 68008
Be of limitations caused by the infeasibility to perform detailed i ns pections which would I
I I
not interfere with reroofing work, please indicate compliance with the following r equirements i
following this re ropfing job.
V
1, 0 t
Permit M,
Installation Date:
YES, NO
The materials and methods o f a pplication used for r ecovering or replacing the existing
roof covering comply with the requirements of the building code, (R907A)
er that consists of at least two layers Of
ICE PROTECTION . INSTALLED: An ice barrier
dified bitumen sheet was installed aria
un derlayment or of a self-adhering polymer MO
extends at least from the eayg! s ed & to a point at least 24 inches inside the exterior
wa ll fl n e of the building. (R906.2.7.1)
STRUCTURAL COMARE 1--
ONVMTS AR ' The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that Will be encountered during Installation of the roof covering system. (8907.2)
s ti ng r oof covering was removed for one
G WAS REMOVED: Ext
EXISTING COVERIN - , — - i
of the reasons required by section 8907.3
No RUSTED METAL OR, FLASHING ,: Existing vent flashing, metal edges, drain
outlets, collars or metal counter-fla shing were not reinstalled if rusted, (8907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstrticted in accordance
with approved ' installation instructions. Metal ilashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907,6)
Date
; Primary I lien Signatur of Primary I lier
Date
Signature of Permit Holder