CHECKLIST MS-2014-01926_0001.jpg 2009 INTERNATIONAL R CODE
CITY OF BLA
1R REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final inspection
21 8 S 16 Street, Blair, NB 68008
Because of limitations caused by the infeasibility to *perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit #.
Installation Date:
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with th e requirements of the building code. (R907.1)
Q ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
self-adhering polymer modified bitumen sheet was installed and
underlayment or of a self - g p y
extends at least from the eaye's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL C ®MPONENTS ARE SOUND: The structural roof components are
y
capable of supporting the roof
covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXI STING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
® NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
counter- flashin
outlets, collars or metal co g were not reinstalled if rusted. (R907.5)
® FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Signature of Primary Installer Date
A
i�
Sign eof Permit Holde Date