Checklist MS-2014-02157.tif 2009 INTERN R
QTY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair city Hall prior to Final inspection t
218 S I6th Street, Blair, NE 68008
Because of limitations caused by the infeasibility to 'perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit #:
Installation Date:
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
(� ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eaye's edge to a point at least 24 inches inside the exterior
wall lime of the building. (R905.2.7.1)
STRUCTURAL COCItIPONENTS ARE SOUND: The structural roof components are
stem and the material and equipment loads
s
capable of supporting the roof covering y
that will be encountered during installation of the roof covering system. (R907.2)
� ExISTI
NG GOVI =RING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
NO RUSTED t�IETAL OR FLASHING: Existing vent flashing, metal edges, drain
counter-flashing outlets, collars or metal counter g were not reinstalled if rusted. (R907.5)
[� FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
., ° 'i✓f'' � r� /( is
Signature of Primary Installer
Date I
t
Date
Snature of Permit Holder
ig