Loading...
Checklist MS-2014-01919.tif . i i 2009 INT RES IDENTIAL CODE - CITY OF LAIR R E R OOFING CHECKOFF SHEET Blair City Hall rior to Final Inspection Return �o � th � p c 218 S '1 � 6 Street, Blair, NE 65008 Be cause of limitations caused by the infeasibility toverform detailed Inspections which d not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit installation Date : YES NO (� The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) {� ICE PROTE CTION INSTALLED: An ice barrier that consists of at least two layers of underla Y meet or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eaye's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) C� STRUCTUR COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2 � E�iSTING COVE ING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 N0 RUSTED METAL OR FLASHING= Existing vent flashing' metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5) ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) - Sig - ig e of r' ary ins Date ller _ Date ,f Sig re of e it Holder