Checklist MS-2014-01919.tif . i
i
2009 INT
RES IDENTIAL CODE -
CITY OF LAIR R E R OOFING CHECKOFF SHEET
Blair City Hall rior to Final Inspection
Return �o � th � p c
218 S '1 � 6 Street, Blair, NE 65008
Be
cause of limitations caused by the infeasibility toverform detailed Inspections which d
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit
installation Date :
YES NO
(� The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
{� ICE PROTE
CTION INSTALLED: An ice barrier that consists of at least two layers of
underla Y meet or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eaye's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
C�
STRUCTUR COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2
� E�iSTING COVE
ING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
N0 RUSTED METAL OR FLASHING= Existing vent flashing' metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5)
❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
- Sig -
ig e of r' ary ins
Date
ller _ Date
,f
Sig re of e it Holder