Loading...
Checklist MS-2014-01795.tif 2 009 INTERNATIONA RESIDENTIAL CITY O B LAI R RE ROOFING CHECKOFF SH Return to Blair city Hall'priorto Final Inspection 21 8 S 1 6 th Street, Blair, NE 68008 Because of limitations tations caused b the infeasibility to'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing Job. Permit #: . Installation Date: ` j3 // YES NO The materials and methods of application usbd for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) 1 CE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underla Y meet or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eavds edge to a point at least 24 inches inside the exterior wall line of the building. (8905.2.7.1) S RUCTURAL COMPONENTS ARE SOUND. The structural roof components are g Y capable of supporting the roof covering system and the material and equipment loads . that will be encountered during installation of the . roof covering system. (R907.2) EXISTING COVER 11�G 1NAS REM VED: Existing roof covering was removed for one of the reasons required by section 8907.3 (� NOrUSTED METAL OR FLASHING; Existing vent flashing, metal edges, drain outiets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5) • Flashing shall be reconstructed in accordance with approved manufacturers installation FLASHING INSTALLED PROPIP.LY F Instru Lions Metal flashing to which bituminous ous materials are to be adhered shall be primed prior to installation. (8907.6) i ture of Primary installer Date t Si nature of Permit Holder Dat g � j i i