Checklist MS-2014-01640.tif I
2009 INTERNATIONAL RESIDENTIAL CODE
RO 1 CHECKOFF H T
�T 0 LAtR RE r
Return to Blair City Hall prior to Final Inspection
218S16 th Street, Blair, NE 68008
Because
of limitations caused by the infeasibility to perform detailed inspections which would t
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
L � I
Permit #.
G am- Z(D)
Installa Date: l
%r EQ NO
(� The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907A)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underia ment or of a self - adhering polymer modified bitumen sheet was installed and
Y
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wail line of the building. (R905.23.1) j
• components are
STRUCTURAL COMPONENTS ARE SOUND. The structural roof p loads
capable of supporting the roof covering system and the material and equipment
fih at will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5)
I
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
® s. Metal flashing with approved manufacturer's installation instruction g fio which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6) E
1
Si iature Primary Installer
Date
Date
gnature of Permit Holder