Loading...
Checklist MS-2014-01640.tif I 2009 INTERNATIONAL RESIDENTIAL CODE RO 1 CHECKOFF H T �T 0 LAtR RE r Return to Blair City Hall prior to Final Inspection 218S16 th Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would t not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. L � I Permit #. G am- Z(D) Installa Date: l %r EQ NO (� The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907A) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underia ment or of a self - adhering polymer modified bitumen sheet was installed and Y extends at least from the eave's edge to a point at least 24 inches inside the exterior wail line of the building. (R905.23.1) j • components are STRUCTURAL COMPONENTS ARE SOUND. The structural roof p loads capable of supporting the roof covering system and the material and equipment fih at will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5) I FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance ® s. Metal flashing with approved manufacturer's installation instruction g fio which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) E 1 Si iature Primary Installer Date Date gnature of Permit Holder