Loading...
Checklist MS-2014-01719.tif I Y i i 2009 INTERNATIONAL RESIDENTIAL CODE - CITY OF BLAIR REROOFING CHECKOFF SHEE I Return to Blair city Hall* prior to Final inspection 218S16 th Street, Blair, NB 68008 Because of limitation Y l imit ation s caused b the infeasibility to *perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. • � �� — J Permit #: /� J� l2 41)� 1 Installation Date: 15 YES 0 The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.9) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers o underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2•7• S RUCTURAL COMPONENTS ARE SOUND: The structural roof components are ® T covering system and the material and equipment loads capable of supporting the roof co g y that will be encountered during installatlori of the roof covering system. (R907.2) EXI ING COVERING WAS REMOVED: Existing roof covering was removed for one T . of the reasons required by section R907.3 (� NO RUSTED METAL OR FLASHINGx Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) S' nature of Primary Installer Date Date Signature of Permit older