Checklist MS-2014-01289.tif i i
c
i
2009 INTERNATIONAL RESIDEN
CITY OF BLAIR REROOFING CHECKO ST �
Return to Blair City Hall' prior to Final inspection
218S16 th Street, Blair, NB 68008
Because of limitations ons caused b the infeasibility to , perform detailed Inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit #: ,
Installation Date: — 2—
ES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
Q lCE PROTECTION INSTALLED: An ice barrier that consists of at least two layers o
underlayment or of a self- adhering polymer modified bitumen sheet was installed a
extends at least from the eaye's ed e to a point at least 24 inches inside the extent I
wall line of the building. (R905.2.7.1) E
`
ST RUCTURAL COMPONENTS ARE SOUND: The structural roof components are
U � T loads
capable of supporting the roof covering system and the material and equipment 1
.. that will be encountered during
installation of the roof covering system. (R907.2)
Ex1STING COVER1NG WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
v ent flashing, metal edges, drain
•(� NO RUSTED METAL Op. FLASHING= Existing reinstalled if rusted. (8907.5)
outlets, collars or metal counter flashing were no t
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6)
Date
Signature Signature of Primary Installer Da
i
Ya ate
Signature of Permit Holder