Loading...
EL-2014-02147_0001.tif 1 CITYOF BLAIR f 218 S. 16TH STREET BLAIR, NEBRASKA 68008 " � 1 �) - -. K Building Permit Application (402) 426 -4191 -Phone (402) 426 -4195 -FAX EL- 2014 - 02147 f �� ° '��se os a ° ° �� www.blairnebraska.org 08/13/2014 ShellyJ ELECTRIC Residential August 13, 2014 LOCATIONOFIMPROVEMENT: 1250 Corey Dr, Blair, NE 68008 1 ARCHITECT: GENERAL SELF OWNER: Gregory W Mcintosh CONTRACTOR: 1250 Corey Dr Blair, NE 68008 BLAIR, NE 68008 -0000 21 N n e, -.> c: NATURE OF WORK STRUCTURE Sub -Work New Const Primary PROJECT NAME PERMIT EXPIRES 08/12/2016 1250CoreyDr- 140624 - Garage addition ESTIMATED COMPLETION DATE 9/30/2014 DESCRIPTION OF WORK Electrical for garage addition DEPOSIT PAID BY: SITE PLAN SUBMITTED: NA Contractor REScheck/COMcheck SUBMITTED: NA DEPOSIT STATUS: BUILDING PLANS SUBMITTED: NA N/A .-. .. ✓"" NJ '.'...„; ?" '^:;z"�" ': 1 :t s I = ":y_Y:i. e v",:_ -,r 4, ' ,✓ _..- 0 r'.....r. - ',.... -' ra.• ;,r....,:. - .3'`", t'"',;,..s� x .�.. e .,.3w ...5... . �.:v ;,.,,<.," ... ._. ' +. 1. No work will be started before a permit is ISSUED AND POSTED. 2. For commercial permits, a set of plans for this project must be submitted to the Nebraska State Fire Marshal's Office for review. 3. Separate permits are required for electrical, plumbing, heating, ventilating and air conditioning, and septic system. 4. The undersigned owner or agent understands and acknowledges this building permit application does not constitute issuance of this building permit. It is further understood that construction covered by this permit application shall not be commenced until a copy of a permit signed by the Building Inspector is issued. 5. The undersigned owner or agent agrees to perform the proposed work in accordance with the specifications set forth above and in accordance with the codes /ordinances of the City of Blair and the State of Nebraska. Any omission of or misrepresentation of fact with or without the intention of the undersigned or any alteration or change from this application without approval of the Build' Official, shall constf ute, sufficient ground for the revocation of any permit issued which was based on the approval of this ap icati n. i Date Signature of pplicant i