Checklist MS-2014-00331.tif i
f
Aug 081410 :50a
p.8 �
2009 IN TERNATIONAL RESIDENTIAL
CITY OF BLAIR REROOFING CHEC STET
Return to Blair .e y Hall prior to final inspection
2'18 S 16 Blair, NE 68008
Because of Iirnitations caused by the infeasibility to perform detailed inspections which would
.not interfere with reroofing work, please indicate compliance with the following requirements
followin this reroofing job.
Permit #:: y �
'o rr Date.
S2V
I nstallab
YES NO
[� The materials and methods of application used for recovering or replacing the existing ;
roof covering comply with the requirements of the building code. (8907.1)
ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polyrner modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior ;
vnli line of the building. (8905.2.7.1)
[� STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED: ExlsUng roof covering was removed for one
of the reasons required by section 8907.3
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted. (11907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (11907.6)
Z
-) q
St'gnatur Primary I 7 [Date
Si ure of ermlt Holder Date
S ik r
i
i