Checklist MS-2014-00829.tif I
p.11
Aug 08 1410:51 a
RNATIO RESI DENTIAL
2009INTE LAIR REROOFING CHECKOFF SHEET
cI �ina1 inspection
Return to wain City !-call prior to
218 S U Street, Blair, NE 88048
feasibility to perform detailed inspections which would
Because of limitations ca used b Y the in e, indicate compliance with the following requirements f
riot interfere with reroafin work, pleas
followin this reroofing job.
Permit #: (,s
lnstailation late:
YES NCa
� The materials and methods of application used for recovering � the existing
roof covering campiY
With the
of the building ca (R907,1)
•
j
ICE ROTECTiON INSTALLED; An ice barrier that consists of at least two layers of
rin poly modified bitumen sheet waS Instatted and
underlay ment or of a self- adhe g p Y
extends i least from the eave's edge to a paint at least Z inches inside the exterior
wall line of the building. (R905.2.7A)
C3 STRl7CTUf�AL COMPONENTS ARE SOUNC7: The structural roof components are
stem and the material and equipment loads
s
capable of supporting the root covering y
that will be encountered during installation of the roof covering system. (8947.2)
q ISTiNG COVERING INAS REMOVED. Existing roof covering was removed for one
EX
of the reasons required by section 8907.3
(� NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
ou tl e ts, collars or metal counter - dashing were not reinstalled if rusted. �R
I
shall be reconstructed in accordance
FLASH11dG iNSTALLEG'3 PRtJF_._. Ei�LY= Flashing .
with approved manufacturer's installation instructions Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.4)
J . �z ��.
re of 'Primaty
installer ate
,,itf c,s the < Date
Signature of Permit Holder
i
j