Loading...
Checklist MS-2014-00829.tif I p.11 Aug 08 1410:51 a RNATIO RESI DENTIAL 2009INTE LAIR REROOFING CHECKOFF SHEET cI �ina1 inspection Return to wain City !-call prior to 218 S U Street, Blair, NE 88048 feasibility to perform detailed inspections which would Because of limitations ca used b Y the in e, indicate compliance with the following requirements f riot interfere with reroafin work, pleas followin this reroofing job. Permit #: (,s lnstailation late: YES NCa � The materials and methods of application used for recovering � the existing roof covering campiY With the of the building ca (R907,1) • j ICE ROTECTiON INSTALLED; An ice barrier that consists of at least two layers of rin poly modified bitumen sheet waS Instatted and underlay ment or of a self- adhe g p Y extends i least from the eave's edge to a paint at least Z inches inside the exterior wall line of the building. (R905.2.7A) C3 STRl7CTUf�AL COMPONENTS ARE SOUNC7: The structural roof components are stem and the material and equipment loads s capable of supporting the root covering y that will be encountered during installation of the roof covering system. (8947.2) q ISTiNG COVERING INAS REMOVED. Existing roof covering was removed for one EX of the reasons required by section 8907.3 (� NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain ou tl e ts, collars or metal counter - dashing were not reinstalled if rusted. �R I shall be reconstructed in accordance FLASH11dG iNSTALLEG'3 PRtJF_._. Ei�LY= Flashing . with approved manufacturer's installation instructions Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.4) J . �z ��. re of 'Primaty installer ate ,,itf c,s the < Date Signature of Permit Holder i j