Loading...
Checklist MS-2014-00774.tif i p.2 v Aug 08 1410:49a 2009 INTERNATIONAL RES H � 0 k� � I L,At REROOFING � e�tic�n Return to Blair City Hall prior to Final B >n n s p 218 S ie street, Blair, NE 68 t3eoau5e of limitations C � aused b the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements f this reroofing job. Permit #: �- �� Men LA(,e-- Installation Date: YES No Q The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) Q ICE PROTECTION INSTALLED: An ice barrier that consists Of at least two layers of I underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the e a ave' edge to s prsint at least 24 inches inside the exterior wall line of the building, (11905.2.7.1) [� STRU TURAL COMPONENTS ARE SOUN The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) Q EXISTING COVERING VITAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 Q NO RUSTEv METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (1907.5) [ FLASH 3NG INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved man installation instructions_ Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (i9 07.8) ature of Primary Installer to "of Date der i C f t }