Loading...
Checklist MS-2014-00831.tif Aug 081410:49a P.5 INTERNA TIONAL ` � T CI B L AIR ER FIN CHECKOFF S HEE Return to flair City Hail prior to Final Insp j 218 S i s'" Street, Blair NE 680 causes! b he infeasibility to perfarrn detailed inspections whic wo uld Because Of l�mit2ttlor Y • not interfere with reroofing work, please indicate compliance with the following requi follawin this reroofing job. _ t permit #: ndt4 - T� � 1 Installation Date: 2 � � ° � q YES ' No 'The materials and methods of application used for recovering or replacing the existing ; roof covering comply with the requirements of the building code. (8907.1) ICE PROTEC"riOM ws rALLED: An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's ed a to a point at least 24 inches i sside the exterior wall line of the building. (8905.2.7.1) sTRUG`rU L COMPONENTS► ARE Ol NO, The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will, be encountered during installation of the roof covering 5y -Stem. (8907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was rernaved for one of the reasons required by section R907,3 (� NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8,907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance wKh approved manufacturer's installation instructions. Metai flashing to which bitumen ) us materials are to be adhered shall be primed prior to installation- (R907.6) 4 nature o rirnary Installer date Cigna ure cf Permit Holder Date 4 I i