Loading...
Checklist MS-2014-01924.tif I f 2009 INTERNATIONAL RESIDENTIAL CODE - COY OF BLAIR RE ROOFING CHECKOFF SHEti Return to Blair City Hale prior to Final Inspection f Ret y 68 008 218 S '16 t h Street, Blair, NE Because of limitations caused by the infeasibility to *perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements f©llowin„g, this reroofing job. Permit #: /W _�`�/— Installation Date: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's ed e to a point at least 24 inches inside the exterior wall line of the building. (8905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are coveri s ds capable of supporting the roof g stem and the material and equipment loa y that will be encountered during installation of the roof covering system. (8907.2) STING IN CpVERG WAS REMOVED: Existing roof covering was removed for one � EXl . of the reasons required by section R907.3 (� NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance 'o instructions. Metal flashing to which with approved manufacturers installation bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Signature of Primary Installer Date i Date of Permit older I I