Loading...
Checklist MS-2014-01880.tif Agh009 INTERNATIONAL RESIDENTIAL CODE - CITY OF BLAIR REROOFING CHECKOFF SH Re to Blair city Half prior to Final inspection 1 6th S treet, lair, NB 68008 • i limita tions caused b the infeasibility to'perform detalled inspections which would ` Because of limita Y not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. _ Permit �: �� � -° t� i �'-� � 1 �� � do t � Installation Date i YES NO The materials and methods of application used for recovering or replacing the existing • o the building code. (R907.'1) roof covering comply with the requirements f g ICE PROTECTION INSTALLED; An ice barrier that consists of at least two layers of E ' stalled and underlayment or of a self-adhering polymer modified bitumen sheet wa s in extends at least from the eaye's ed a to a point at least 24 inches inside the exterior xfi _ • wall Iine of the building. (11905.2.7.1) STRUCTURAL. GOMPONENTS ARE SOUND: The structural roof components are • material and equipment apable of supporting the roof covering system and the mat Loads ri q p that will be encountered during Installation of the roof covering system. (R907.2) EXISTING COVERING WAS REW1OVED: Existing roof covering was removed for one i of the reasons required by section 8907.3 NO RUSTED IUIETAt OR PLASHING: Existing vent flashing, metal edges, drain ' outlets, collars or metal counter-flashing were not rein stalled if rusted. ( R907.5) OI=f PLASHING INSTALLE PROPERLY: Plashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (11907.6) ' 1 Signature of Primary installer Date E Signature of Permit Holder Date t i . i i f