Checklist MS-2014-01880.tif Agh009 INTERNATIONAL RESIDENTIAL CODE -
CITY OF BLAIR REROOFING CHECKOFF SH
Re to Blair city Half prior to Final inspection
1 6th S treet, lair, NB 68008
• i
limita tions caused b the infeasibility to'perform detalled inspections which would `
Because of limita Y
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
_ Permit �: �� � -° t� i �'-� � 1 �� � do
t �
Installation Date
i
YES NO
The materials and methods of application used for recovering or replacing the existing
• o the building code. (R907.'1)
roof covering comply with the requirements f g
ICE PROTECTION INSTALLED; An ice barrier that consists of at least two layers of
E
' stalled and
underlayment or of a self-adhering polymer modified bitumen sheet wa s in
extends at least from the eaye's ed a to a point at least 24 inches inside the exterior
xfi _ •
wall Iine of the building. (11905.2.7.1)
STRUCTURAL. GOMPONENTS ARE SOUND: The structural roof components are
• material and equipment apable of supporting the roof covering system and the mat Loads ri q p
that will be encountered during Installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REW1OVED: Existing roof covering was removed for one i
of the reasons required by section 8907.3
NO RUSTED IUIETAt OR PLASHING: Existing vent flashing, metal edges, drain
'
outlets, collars or metal counter-flashing were not rein stalled if rusted. (
R907.5)
OI=f
PLASHING INSTALLE PROPERLY: Plashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (11907.6)
' 1
Signature of Primary installer Date
E
Signature of Permit Holder Date
t
i
. i
i
f