Checklist MS-2014-01785.tif 2- INTERNAT RESIDENTI
p
C IT Y IITM REROOFI
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would I
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job, j
Permit #:
� �5 ? C � 0'/7LE
Installation Date:
YE NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907;2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
[� NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
t
{
❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bitumino aterial are to be adhered shall be primed prior to installation. (R907.6)
Signature o ri ry Installer Date
Si nature of Permit Holder Mte