Checklist MS-2014-01309.tif i
r
I
08-08-'14 12:20 FROM- Absolute Customs T -962 F9017/0017 F -119
26ro'009 INTERNATIONAL i
RESIDEN CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final I nspection
18 S i 6tn treet Blair NE 68008
Because of limitations caused by the infearsibility to perform detailed inspecti which wou
,let infaYf9re with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit #: to E_k �J�� cwv�,&Q_o
�"
�P kQ
Installation mate:
YES NO
The materials and methods of application used for recovering or relalacing the existing ,
roof covering comply with the requirements of tlle code, (119071)
ICE PROTECTION 1N. P LLF, --D; An ice barrier that co of at least two levers of
was intnlld
underlayment or of a self adhor»ng polymer modified b itumen and
l itumen sleet ... —
exteilds at least f�'c the e ve' d e to a point of ie�st �� inohe ins de the Exterior
wall line of the wilding. (11905.2.71)
TRUCTURAL COMPONFEI Al -U SOi, MD: The structiAtal roof cornponents are
pp
capable of su ortin g the roof ceuefing BY$tem and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
l �l'lN + £f1l RIN WAS REM9VED: Existing roof covering way removed for one
re asons requir b
of the re I Y section 8997.3
ISO RUB crao Ml" CAL OfP, FLASHING: Exiating vent flashing, metal edges, drain
ou refs collars or metal counter-flashing were not reinstalled if misted. (R907.5)
FLASHING IN TA Li °C► PROPF -RLY. Flashing s hal l . Metal fla recons in c oordanoe
l�la
with app roved manufaoturer's installatlon instructions.
bituminous materials are to be adhered small be primed prior t0 installation. (R. Off.
Signature of Primary Installer as
Daff
ignature of Pe if Ho der