Checklist MS-2014-01307.tif 08-08-'14 12:20 FROM - Absolute Customs T -062 P0016/0017 F -119
2009 INTERNATIONAL RESIDENTIAL CODE
I
r
C ITY OF BLAIR REROOFING. + CHECKOFF SHEEN"
R turn to Blair City H prior to Final in spection
218S I th treet, f3lair, NE 6 -008
because of limitations oatised by the. infeasibility to perform detailed inspections which Would
too interfore with reroofing work, please Indicate co pliftnoe with the following requirements
following this reroofincj job.
Permit: �' .� SDUQJW-P
Installation Date. .�,. -�-. --
0 - 3 �
ypq No
The materials and methods of application used for recovering or relaiaoing the existing
roof cover comply with the requirements of the building cods, (11907.1)
ICE ]PROTaCTI N INSTALLED, An lee barrier that consists of at least two layers of
r� n
e t or of a self-adhering polymer modified bitumen sheet was instailcd and
underlay �
extends at least fro), the OaVe!s e0e to a point at leas h In 'rd the exterior
wall line of the building. (8905.2.7.1)
` TRUCTt.lRAL COMPO The structural roof components are
o�pabla of suppoding the roof covering system and the rrnateftl and equipment loads
that Will be encountered during Installaflon of the roof covering system. (R907.2)
EXISTING C Q � VERING WAS REMOVFE : Existing roof covering was removed for one
of the reasons required by
section R907.3
NO RUST VD MEYAL OR PLASHING'. p -ylsting vent flcahing, metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted. (RO07.5)
Fl� l ltrl 'i'1�LL i3 tit C PERLY= Flashing shall be reconstructed In accordanoe
wi '
th approved m�znufactur�r s irtSt ellation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prier to installafiorr. {R907.�}
g ig ature of Primary installer ate
.,......
gnature of ormit holder e