Loading...
Checklist MS-2014-01293.tif 2009 INTERNATIONAL RESIDENTIAL CODE - ' f CITY OF BLAIR REROOFING CHECKOFF SHEET Re turn to Bla Ci ty Halfpdor t F inal Inspe 2 18 S 16 try c la NE 680 Because of limitations caused by the infeasibility to'perforrn detailed inspections which would dicafe corn nce with the following requirements lia not interfere with reroofing work, please Indicate compliance following_ this reroofing job. Permit #: ` olq �1 Installation ®ate. r y Y, E4 NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ICE PROTECTION INSTA LLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends atat least from the e ave's edge to a point at least 24 -inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) EXISTING COVERING W AS REMOVED a° Existing roof covering was removed for one. of the reasons required by section 8907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain cutlets, collars or medal counter - flashing were not reinstalled if rusted. (R907.6) i FLASHING INSTA LLED P ROPERLY: Flashing shall be reconstructed in accordance f with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.0) E Signature unary Installer Date Signature of Permit Holder g e 3 Date c c