Checklist MS-2014-01293.tif 2009 INTERNATIONAL RESIDENTIAL CODE -
' f
CITY OF BLAIR REROOFING CHECKOFF SHEET
Re turn to Bla Ci ty Halfpdor t F inal Inspe
2 18 S 16 try c la NE 680
Because of limitations caused by the infeasibility to'perforrn detailed inspections which would
dicafe corn nce with the following requirements lia
not interfere with reroofing work, please Indicate compliance
following_ this reroofing job.
Permit #: ` olq
�1
Installation ®ate. r y
Y, E4 NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
ICE PROTECTION INSTA LLED: An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends atat least from the e ave's edge to a point at least 24 -inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
EXISTING COVERING W AS REMOVED a° Existing roof covering was removed for one.
of the reasons required by section 8907.3
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
cutlets, collars or medal counter - flashing were not reinstalled if rusted. (R907.6) i
FLASHING INSTA LLED P ROPERLY: Flashing shall be reconstructed in accordance f
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.0)
E
Signature unary Installer Date
Signature of Permit Holder g e 3 Date
c
c