Checklist MS-2014-00992.tif i
2 009 I N T ERNATIONAL
CITY OF BLAIR REROO CHEC HEM'
Return to Blair City Hall'prior to Final inspection ,
21 8 sl 8 11 street. Blair, NE 88008
Because of Isms
stations caused by the infeasibility to'perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit #. . 4 - cl ci 2�
Installation Date:
kLy E N
M The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907A)
�
ICE pROTBCTI
qty INSTALLED: An ice barrier that consists of at least two layers 'of
underla y ment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eaye's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
!�
STRUCTURAL GDMPONEN The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2
N •
Ex1STl�lO CaVBRll�O'VVAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
Q
NO RUSTID METAL OR PLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5)
ASHING INSTALLED PROPERLY: flashing shall be reconstructed in accordance
l�L which
i h
t
s
f
Metal flashing o wh
with approved manufacturer's installation instructions. Met al la hang insta o (8907.
bituminous materials are to be adhered shall be primed pri
Si g natur I dry Installer Data