Loading...
Checklist MS-2014-00992.tif i 2 009 I N T ERNATIONAL CITY OF BLAIR REROO CHEC HEM' Return to Blair City Hall'prior to Final inspection , 21 8 sl 8 11 street. Blair, NE 88008 Because of Isms stations caused by the infeasibility to'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit #. . 4 - cl ci 2� Installation Date: kLy E N M The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907A) � ICE pROTBCTI qty INSTALLED: An ice barrier that consists of at least two layers 'of underla y ment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eaye's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) !� STRUCTURAL GDMPONEN The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2 N • Ex1STl�lO CaVBRll�O'VVAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 Q NO RUSTID METAL OR PLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5) ASHING INSTALLED PROPERLY: flashing shall be reconstructed in accordance l�L which i h t s f Metal flashing o wh with approved manufacturer's installation instructions. Met al la hang insta o (8907. bituminous materials are to be adhered shall be primed pri Si g natur I dry Installer Data Q r o Permi Holder Date Stgi furs f j