Loading...
Checklist MS-2014-00881.tif i I i 08-08-'14 12:20 FROCK- Absolute Customs T -062 P0015/0017 F -119 2009 INTERNATIONAL r i i RESIDEN CODE ITT OF IB LAIR REROOFING CHECKOFF SHEtz I oturn to Blair City Hail prior to Final inspection ; 218 S 16 Street, Blair, ME 68000 Se0at,$e of limitations oausod by the Infeasibility tO perform dotailed inspectlons whloh would Ro t interfere with reyoofing work, please indicate CoMplialloe With thO f011owing requirements following this reroofing joie= Permit M ry „-� � Installation Date; .-� YES No The matOdals and methods of application used for recovering or replacing the existl119 rood covering oor reply with the requirements of the building code. (RO07.1) ICE PROTEOT[C)NI INSTALLED An ioe barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen shoot was instill and extends at least frol the eave's ed e to a point at least _ ino �e inside the exterior wcall line of the bullciing. (R@05.2.7.I) STRUT AL IVtP I ITS ARF, l��t�Ul� Q The structural roof components are o of supporf iv the roof covering system and the Material and equipment loo ds that will be encountered during lnstallation of the roof covering system. (R9O7.2) . ` rmi TIN VI R'� 1 SAS REM OVED: Existing roof covering was removed for one of the reasons required by section 8907,3 ! tic �1G 11t1� "AL LA I•lltrl '. l=' - xistirng vent flashing, metal edges, drain outlets, collars or metal oounter flashing were not reinstalled if gusted. {R907.5} LA i-l1lV ifii .TAI_LED pRt_PERLY: Flashing shall be cecon trusted I I I ac co rdance . with approved manufacturer's installation instructions. Metal flashing to which bituminous Inatedals are to be adhered shall be primed prior to installation. (RO07.6) S ignature of Primary Installer D e s D I nat��r� a P rmit Holder oat I