Checklist MS-2014-00881.tif i
I
i
08-08-'14 12:20 FROCK- Absolute Customs T -062 P0015/0017 F -119
2009 INTERNATIONAL r
i
i
RESIDEN CODE
ITT OF IB LAIR REROOFING CHECKOFF SHEtz I
oturn to Blair City Hail prior to Final inspection ;
218 S 16 Street, Blair, ME 68000
Se0at,$e of limitations oausod by the Infeasibility tO perform dotailed inspectlons whloh would
Ro t interfere with reyoofing work, please indicate CoMplialloe With thO f011owing requirements
following this reroofing joie=
Permit M
ry
„-� �
Installation Date; .-�
YES No
The matOdals and methods of application used for recovering or replacing the existl119
rood covering oor reply with the requirements of the building code. (RO07.1)
ICE PROTEOT[C)NI INSTALLED An ioe barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen shoot was instill and
extends at least frol the eave's ed e to a point at least _ ino �e inside the exterior
wcall line of the bullciing. (R@05.2.7.I)
STRUT AL IVtP I ITS ARF, l��t�Ul� Q The structural roof components are
o of supporf iv the roof covering system and the Material and equipment loo ds
that will be encountered during lnstallation of the roof covering system. (R9O7.2) .
` rmi TIN VI R'� 1 SAS REM OVED: Existing roof covering was removed for one
of the reasons required by section 8907,3
! tic �1G 11t1� "AL LA I•lltrl '. l=' - xistirng vent flashing, metal edges, drain
outlets, collars or metal oounter flashing were not reinstalled if gusted. {R907.5}
LA i-l1lV ifii .TAI_LED pRt_PERLY: Flashing shall be cecon trusted I I I ac co rdance
. with approved manufacturer's installation instructions. Metal flashing to which
bituminous Inatedals are to be adhered shall be primed prior to installation. (RO07.6)
S ignature of Primary Installer D e
s
D I
nat��r� a P rmit Holder oat
I