Loading...
Checklist MS-2014-00806.tif i RESI DENTIAL 2 009 INT C HECKOFF SHEEN` CITY OF BLAIR RER OOFING Rouyn o Blair C it Hall' prior to Final Inspection 218 s i 6 th street, Blair, NE 68003 limitations caused by the infeasibility to'perform detailed inspections which would Because of not interfere with reroofing work, please indicate compliance with the following requirements f ollowing this reroofing job. P Installation Dater , a I L YE NO The materials is and methods of application used for recovering or replacing the existing � roof covering comply with the requirements of the building code. (R907.'I) � ICE PROTECTION INSTALLED; An ice barrier that consists of at least two layers 'of underla meet or of aself- adhering polymer modified bitumen sheet was installed and Y extends at least�from the ea _ edge_ to a point at least 24 inches inside the exterior wall line of the building. (R905.2. 7.'l) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are s p ca able ©f supporting the roof covering system and the material and equipment load • ; that will be encountered during installation of the roof covering system. (R907.2 ExtSTI , G COVERIMG WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 ( NO RUSTED [METAL OR PLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (8907.5) k.ASHING INSTALLED PROPERLY; Plashing shall be reconstructed in accordance Me tal with approved manufacturer's installation instructions. tal flashing to which bituminous materials are to be adhered shall be primed p rior to installation. (8907.6) Si g nat ri ary Installer Date Date S U n ure of Kermit Holder V I e I . f