Loading...
Checklist MS-2014-00575.tif 2009 I NTERNATIONAL RESIDE CI O RER OOFING CHECKOFF SHEET rn o Blair i Hall' prior to Final Inspection 218 l 6 Street,. Blair, NE 680 Because of limitations caused by the infeasibility to 'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit #. installation Date: - 7 , Li E NO The mater ials and methods of application used for recovering or replacing the existing � roof covering comply with the requirements of the building code. (11907.1) ICE C lON lNs`rALLED: An ice barrier that consists of at (east two layers °of � PRATE T underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at (east from the eave's edge to a paint at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STR. UCTURAL. COMPONENTS ARE S0UI�ID. The structural roof components are p ca able of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) EXISTll�lO coVERIMG WAS RECVIOVEM Existing roof covering was removed for one of the reasons required by section R907.3 [� NC RUS`rED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (8907.5) FLASHiNO INSTALLED PROPERLY; Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) t ller Date Sign e of Pr ary ins a Date Signat re o Permit Holder