Checklist MS-2014-00575.tif 2009 I NTERNATIONAL
RESIDE
CI O RER OOFING CHECKOFF SHEET
rn o Blair i
Hall' prior to Final Inspection
218 l 6 Street,. Blair, NE 680
Because of limitations caused by the infeasibility to 'perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit #.
installation Date: - 7 , Li
E NO
The mater ials and methods of application used for recovering or replacing the existing
�
roof covering comply with the requirements of the building code. (11907.1)
ICE
C lON lNs`rALLED: An ice barrier that consists of at (east two layers °of
� PRATE T
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at (east from the eave's edge to a paint at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STR.
UCTURAL. COMPONENTS ARE S0UI�ID. The structural roof components are
p
ca able of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTll�lO coVERIMG WAS RECVIOVEM Existing roof covering was removed for one
of the reasons required by section R907.3
[� NC RUS`rED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted. (8907.5)
FLASHiNO INSTALLED PROPERLY; Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
t ller Date
Sign e of Pr ary ins a
Date
Signat re o Permit Holder