Loading...
Checklist MS-2014-00989.tif i r i zUUU I NTERNATIONAL L r% E c C ITY OF B LAIR REROOFING H H T Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 r Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit #: ` (� JL installation Date: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) r ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of j underlayment or of a self - adhering polymer modified b itumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wail line of the building. (R905.2.7.1) j STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads P pP g that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (8907.5) i t I FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bitumi ous materials are to be adhered shall be primed prior to installation. (R907.6) , Signatu of P unary installer D e i g �as L G $ J g 4' � ce` j Signature of Permit Holder Date i 1 i 1