Checklist MS-2014-00989.tif i
r
i
zUUU I NTERNATIONAL
L r% E
c
C ITY OF B LAIR REROOFING H H T
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, NE 68008
r
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit #: ` (�
JL
installation Date:
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
r
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of j
underlayment or of a self - adhering polymer modified b itumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wail line of the building. (R905.2.7.1)
j
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
P pP g
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter- flashing were not reinstalled if rusted. (8907.5)
i
t
I
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bitumi ous materials are to be adhered shall be primed prior to installation. (R907.6)
,
Signatu of P unary installer D e
i g �as
L G $ J
g
4'
� ce` j
Signature of Permit Holder Date
i
1
i
1